Tests VDSL2 TR115

Download TR-115 Issue 2

Download TR-115 Issue 2 Amendment 1

Download TR-115 Issue 2 Corrigendum 2

The Technical report TR-115 has been written by Broadband Forum. It provides a set of test methods to verify a significant subset of the transceiver functional requirements of VDSL2 modems implemented in accordance with ITU-T G.993.2, as well as physical layer OAM configuration and performance monitoring parameters defined in ITU-T G.997.1. This test specification completes TR-114 which provides a set of region specific performance requirements and test methods for VDSL2 modems.

RefTests
5.1Interleaving Delay Test
5.2Impulse Noise Protection Test
5.3Dual Latency Test (optional)
5.4.1Bitswap test
5.4.2Wideband Bitswap Test
5.4.3Seamless Rate Adaptation Test (optional)
5.4.4SOS Test UP and/or DN (optional)
5.5Loop Diagnostic Mode test
5.6VTU-R Inventory Test
5.7.1&2PSD Mask & Aggregate Transmit Power Test
5.7.3In-Band Spectral Shaping Test
5.7.4Downstream Power Back-off Test
5.7.5Upstream Power Back-off Test
5.8Longitudinal Conversion Loss (LCL) Test
5.9Virtual Noise Test (Optional)
5.10Dying Gasp Test
6.164/65-Octet Encapsulation Far-End PTM-TC Performance Monitoring Test (Optional)
7.1Configuration Parameter MINSNRM
7.2Configuration Parameter TARSNRM
7.3Configuration Parameter PSDMASK
7.4Configuration Parameter VDSL2-CARMASK
7.5Configuration Parameter MAXNOMATP
7.6Performance Monitoring Counters for Code Violations and Errored Seconds
7.7Performance Monitoring Counters for SES
7.8Performance Monitoring Counters for Unavailable Seconds (UAS)
7.9Performance Monitoring Counters for Full initialization and Failed Full initialization
7.10Inhibition of Performance Monitoring Counters

 

VDSL2 over POTSProfiles
BA8b
BA8c
BBA12a
BA17a
BA17a Dn&UPBO

 

VDSL2 over IDSNProfiles
BB8b
BB12a
BB17a
BA17a Dn&UPBO